The following are pictures from the install:
This is the first day with tools everywhere....the project would end up taking a whole week! During the install I had to cut a few holes with the hole saw.......and you will never guess what happened........
So I lined up the hole saw and started in drilling a hole for the hoses to go into the engine room but when I saw light it was not the engine room but the shower....I said some words of disappointment and all Angela said was "is it above the waterline or below"! I said "it is above unless your taking a shower"!
Picture to the left is the hole in the bottom of the shower being repaired. Picture to the right is the new hole with hoses run and the "patch job" in the walkway of the first hole. The fixing of the two holes took a whole day away from the project at hand.....but the fix does not leak!!!
These are some of the valves I had to install, left is in the engine room and to the right is the valves and unit in the walk through.
1 comment:
freakin A. i've been dying for weeks to see that shower pan...
good lesson.
-skip